Skip to main content
This guide covers the full installation of the Voltic Smart Room Control system in hotel rooms. It includes prerequisites, mounting instructions for each device, electrical connections, and platform verification.
This guide is a living document. It is updated regularly with new recommendations, best practices, and devices. Always consult it before performing any installation.
1

Install Voltic Hubs and Zigbee Repeaters

This step is fundamental to ensure connectivity for all devices within the rooms.
2

Verify kit numbering per room

Each kit is preconfigured for a specific room. It cannot be swapped between rooms.
3

Mount devices inside each room

Install the Voltic Switch, FrostLine, contact sensors, and presence sensors in each room.
4

Validate on the platform once each floor is finished

Go to app.voltic.es to verify that all devices are synced and reporting correctly.

Guide sections

Prerequisites

Documentation, electrical requirements, network requirements, and kit verification.

VolticHub and Repeaters

Connect and mount the Hub and Zigbee repeaters correctly.

Voltic Switch

Install the smart contactor in the electrical panel.

Voltic FrostLine

Install the digital thermostat for fan coil control.

Contact sensors

Magnetic sensors for doors and windows.

Presence sensors

PIR sensors for bedrooms and bathrooms.
Having trouble during installation? Contact Voltic technical support.